CENTER STREET

Limits: From Veterans Drive to Main Street

Future improvement of two to three-lane expansion of Center Street from Veterans Drive, to Main Street.

Overview

Project Updates

October 2025

The Center Street corridor is being upgraded in both off-system and on-system segments to improve traffic flow and access. Together, these projects will expand the road to provide more lanes, with safety and capacity improvements coordinated with Old Stagecoach Road.

  • Length: Approximately 0.4 miles.

    Location: Center Street from Veterans Drive to Main Street

    • Expand Center Street from two lanes to three lanes to increase capacity

    • Improve road and intersection infrastructure to enhance safety and reduce congestion

    • Enhance drainage and supporting utilities along the corridor

    • Improve sidewalks and pedestrian crossings for better downtown accessibility

  • Construction funded by the City of Kyle’s 2022 Road Bond

    Total Project Cost = $10.2 M

    • Final Design Phase

    • Requests for Construction Proposals: To be scheduled following Right-of-way acquisition and utility coordination

    • Anticipated Construction: Fall 2026 - Fall 2027

Sign Up For Updates

Schedule and Project Status

Project Resources

View / Download Project Schematics

Previous Project Updates

Center Street designs submitted, Jack C. Hays segment at 60%, Kyle Parkway designs submitted

July 24, 2025

Big moves in Kyle! With four roundabouts and major extensions on the horizon, the Parkway/Lehman project is full speed ahead, designs submitted and utilities under review.

Get Your Questions Answered Virtually and In-Person at the 2022 Road Bond Program Open House

March 30, 2025

The City of Kyle is hosting a Road Bond Program Open House on April 10 at 5:30 p.m. at City Hall. Residents can learn about eight road improvement projects from the 2022 bond, ask questions, and provide feedback. The event includes a live Q&A panel and informational stations. Participation is also available online at KyleRoadBonds.com, Kyle10 YouTube, or the City’s Facebook page.

City of Kyle to Host Road Bond Neighborhood Update Focusing on Old Stagecoach Road Project

March 14, 2025

The City of Kyle is hosting a Neighborhood Update on March 25 from 5:30–7:30 p.m. at Wallace Middle School to share details on the Old Stagecoach Road Bond Project. Residents can visit informational stations, ask questions, and provide feedback. The project is part of the 2022 Proposition A bond, funding 8 road projects across Kyle. More info at KyleRoadBonds.com.